Process Mapping Logo

Process Mapping - Forums

Sharing 19 years of knowledge and experience

 
Metastorm BPM forums
Sign up Latest Topics
 
 
 


Reply
  Author   Comment  
Jerome

Avatar / Picture

Guru
Registered:
Posts: 5,507
Reply with quote  #1 

Rendering e-Work Processes Using Swimlanes

Created: 02 Sep 2004
Last edited: 03 Aug 2006


The information in this article applies to product: e-Work 6.5 6.6.x

Discussion

        1. Unzip the attached file into your Designer directory.
                                        2. Run regit.cmd to install the assembly.
3. Add the xml fragment to your oemDesigner.xml file. Note that if you have no tools installed, you may need to add the <ToolsAddIns> section.
4. To test load a procedure, run Tools|SAR Process Documentation. This should open the documentation in Internet Explorer.


Keywords: kb492


__________________
Post an example, and we will have a much better idea what the problem is. In about 90% of posts, the problem is one of communication. Examples bridge that gap.
0
Jerome

Avatar / Picture

Guru
Registered:
Posts: 5,507
Reply with quote  #2 
 


__________________
Post an example, and we will have a much better idea what the problem is. In about 90% of posts, the problem is one of communication. Examples bridge that gap.
0
Previous Topic | Next Topic
Print
Reply

Quick Navigation:


Create your own forum with Website Toolbox!